Renewables.digital currently lists 116 Battery Storage (BESS) transactions between November 2024 and November 2026, with a combined capacity of 51,902 MW. The deals took place in 26 countries, led by Germany (18), United States (17), Finland (15) and United Kingdom (12). The most active companies are Alight (3), BW ESS (3), Copenhagen Infrastructure Partners (3) and Daiwa Energy & Infrastructure (3). The most recent deal is “Zephyrus Enters Romania with Acquisition of 766 MW Solar and 390 MWh BESS Platform” (11 November 2026).
116Transactions
51,902 MWTotal capacity
26Countries
26With PPA
November 2024 – November 2026Period
Key facts
116 transactions between November 2024 and November 2026, 51,902 MW in total (average 476 MW per deal)
How many Battery Storage (BESS) transactions are listed?
Renewables.digital currently lists 116 Battery Storage (BESS) transactions between November 2024 and November 2026, with a combined capacity of 51,902 MW.
Who are the most active buyers of Battery Storage (BESS)?
Alight (3), BW ESS (3) and Daiwa Energy & Infrastructure (3) (number of deals).
Who are the most active sellers?
Fu-Gen (3), BayWa r.e. (2) and Eolus (2) (number of deals).
What is the largest of the Battery Storage (BESS) transactions?
Qualitas Energy Acquires Cero Generation's 5.8 GW European Solar PV and BESS Platform from Macquarie Group with 5,800 MW (7 September 2026).
Zephyrus has acquired a renewable energy platform in Romania comprising seven solar projects with a combined capacity of approximately 766 MW plus 390 MWh of energy storage. The deal includes an established local platform and team, marks Zephyrus' entry into its second European market after Poland, and doubles its mature pipeline to approximately 1.5 GW.
Altus Power has acquired 92 operating projects in 13 US states from Arevon, adding nearly 200 MW of solar and 10 MWh of battery storage. The acquisition grows Altus Power's operating portfolio to 1.7 GW across 33 states and Washington, D.C.
European Energy has agreed to sell 50% of Holsted Solar Park P/S, owner of the operational 148 MW Glejbjerg and 175 MW Holsted solar parks in Vejen, Denmark, plus a planned 87 MW / 351 MWh BESS, to Sampension. Completion is expected in December 2026, subject to customary approvals.
MetaWealth has signed the purchase agreement for a 50 MW / 100 MWh ready-to-build standalone BESS project in Dolj County, Romania, with total investment of approximately EUR 20 million. Construction is scheduled for Q2 2027 with commercial operation in Q3 2027, bringing MetaWealth's Romanian BESS portfolio to 148 MW / 300 MWh.
Demea Sustainable Investment, through its Climate Infrastructure Fund, and Enovos Green Power have acquired the Lanakerveld project near Maastricht, Netherlands: a 45 MWp solar park co-located with a 25 MW / 100 MWh BESS. Construction began in September 2026 with commissioning planned for summer 2027, backed by SDE++ support and ING debt financing.
Hull Street Energy has completed the acquisition of FirstLight's U.S. generation platform from PSP Investments, comprising nearly 1,400 MW including the 1,168 MW Northfield Mountain pumped storage project, 14 hydroelectric stations and three solar and battery facilities across the Northeast.
BW ESS has acquired two 100 MW / 400 MWh standalone BESS projects in Calvados and the Eastern Pyrenees, France from Recurrent Energy, marking BW ESS's entry into its seventh global market. Both projects are in advanced development, with Recurrent Energy continuing to lead development to ready-to-build stage before BW ESS takes over construction and long-term operation.
Masdar has signed an agreement to acquire and develop a 550+ MW solar PV project in Greece from Lightsource bp, expected to become operational by end of 2026. The acquisition, Masdar's first via TERNA ENERGY, will be enhanced with battery storage. Masdar also signed an MoU with Khazna Data Centers to advance green data centre development in Greece.
Greenvolt Power has agreed to sell the Ełk and Turośń Kościelna standalone BESS projects in Poland to A&R Investments. Each project has a capacity of 200 MW / 800 MWh (4-hour duration), both completed in Q3 2026 and backed by 17-year capacity market contracts starting in 2028 and 10-year tolling agreements. Combined capacity totals 400 MW / 1,600 MWh.
Ener has completed the sale of two battery energy storage projects with a combined capacity exceeding 30 MW in Poland to SC Holding, a joint venture between CLARITAS Investments and Sun Res Holding. JLL Energy & Infrastructure Poland acted as exclusive sell-side advisor.
IGNIS has completed the sale of a 656 MW portfolio of 28 renewable energy projects across Italy to flyRen Energy Group SpA, a platform majority owned by Foresight Energy Infrastructure Partners II. The portfolio spans solar PV, battery-hybrid and wind assets at various development stages across multiple Italian regions.
TAURON has acquired the BME Jawor ready-to-build battery energy storage project (28.27 MW / 120 MWh) in the Wałbrzych Special Economic Zone in Jawor, Lower Silesia, Poland. The 40-container BESS is scheduled for commissioning in February 2027 and benefits from a capacity market contract secured for 2029–2045 at PLN 264.9/kW/year.
UAB Evecon has sold a ready-to-build hybrid project in Lithuania's Marijampolė region to TASE-listed Energix Renewable Energies for €25.4 million. The project comprises a 220 MW wind farm, a 60 MWp solar park and a 286 MWh BESS, with all building permits in place and commercial operation targeted by end of 2027. Estimated construction cost is approximately €400 million.
Atmos Renewables has acquired the Bullawah Wind Farm development in the Riverina region of New South Wales from BayWa r.e. The Stage 2 component has 262 MW of South West REZ access rights, forming part of an overall 800 MW wind and 359 MW BESS project design. Investment readiness is targeted for 2027.
Daiwa Energy & Infrastructure has acquired a 49% stake in the 157 MWp Elsterheide solar park and 80 MWh BESS in Saxony, Germany from Ampyr Solar Europe. ASE retains 51% and long-term operational management. The recently commissioned project generates enough electricity for approximately 51,400 households and is backed by a 120 MWp PPA, a BESS tolling agreement and EEG remuneration.
Foresight Energy Infrastructure Partners II has completed the acquisition of Nivala, a 100 MW / 400 MWh ready-to-build BESS project in North Ostrobothnia, Finland from Fotowatio Renewable Ventures. Finland's largest BESS project, Nivala is expected to begin commercial operations in H2 2028, serving Finland's wholesale, intraday and ancillary services markets.
Ares Management Corporation has made a structured capital investment in Statera Energy's 1.9 GW flexible energy portfolio in the UK, comprising battery storage, wind and solar projects at various development stages. Statera retains majority ownership and continues to lead development, with Ares providing capital to accelerate project delivery.
LGI Limited has acquired two fully operational NEM-connected solar farms in Queensland — Brigalow (27.3 MW) and Chinchilla (14.7 MW) — from IIG Solar Asset Trust for A$22 million. Both sites offer BESS co-location optionality and will be integrated with LGI's DACS system. The acquisition upgrades LGI's strategic pipeline target to over 120 MW.
Usva Energia has completed the sale of a 100 MW ready-to-build battery energy storage system in Kotka, Kymenlaakso, Finland to Enlight Renewable Energy. The fully permitted project has grid connection secured at Kotka substation and will connect to Fingrid's transmission grid.
Actis has acquired a 244 MW / 1,141 MWh BESS portfolio in Poland from DRI, comprising a 112 MW / 518 MWh project in Kozienice and a 132 MW / 623 MWh project in Trzebinia. Both assets hold 17-year inflation-indexed capacity market contracts and will be among Poland's first utility-scale BESS projects to reach commercial operation. The deal builds on Actis' July 2026 acquisition of Klara Renewables.
BayWa r.e. has sold the 22 MWp Gresselgrund solar project with a co-located 60 MWh BESS in Maroldsweisach, Landkreis Haßberge, Bavaria to iAccess Energy. Construction is scheduled to begin in November 2026, with commissioning targeted for 2027. This is the second project sale between BayWa r.e. and iAccess Energy.
Alight has acquired a portfolio of 40 large-scale solar development projects totalling approximately 2 GW from Soltech Energy Solutions in southern Sweden (SE3 and SE4). Most sites include battery storage options. The acquisition brings Alight's Nordic solar and storage pipeline to over 5 GW. Transaction approved by Sweden's ISP.
Fu-Gen has closed on the sale of the 100 MW Kärppiö ready-to-build BESS project in Teuva municipality, South Ostrobothnia, Finland to Nala Renewables. The transaction is the third under a framework agreement between the two parties, bringing Nala's Finnish BESS pipeline to 275 MW / 550 MWh. Construction is expected to begin later in 2026.
Nordi has completed the sale of a 125 MW / 500 MWh ready-to-build battery energy storage project in Kristinestad, Ostrobothnia, Finland to Enlight Renewable Energy. The project is located adjacent to Fingrid's Kristinestad substation with all key permits and grid connection agreement in place. Commercial operation is expected in Q1 2028.
RP Global has acquired the fully permitted 22 MWp A6 Leiningerland solar PV project from GAIA, located along the A6 motorway in the Leiningerland area of Rhineland-Palatinate, Germany. The three-site, 17.9-hectare project qualifies for EEG remuneration and is planned to begin construction in early 2027. RP Global also plans to add battery storage to the project.
Data as of 12 November 2026. The overview covers the transactions currently listed in the Renewables.digital database; each deal links to its original public source.