ACEnergy: Renewable Energy Transactions

ACEnergy appears in 1 renewable energy transaction tracked by Renewables.digital (1 as seller) in August 2026, with a combined capacity of 250 MW. Technologies: Battery Storage (BESS) (1). Countries: Australia (1). The most recent deal is “BW ESS Acquires 250 MW / 1,000 MWh Yanco BESS in Riverina, New South Wales from ACEnergy” (13 August 2026).

  • 1Transactions
  • 250 MWTotal capacity
  • 1Countries
  • 1With PPA
  • August 2026Period

All transactions involving ACEnergy

DateTransactionTechnologyCapacityCountryBuyerSeller
BW ESS Acquires 250 MW / 1,000 MWh Yanco BESS in Riverina, New South Wales from ACEnergy Battery Storage (BESS) 250 MW Australia BW ESS ACEnergy

Deal summaries

BW ESS Acquires 250 MW / 1,000 MWh Yanco BESS in Riverina, New South Wales from ACEnergy

13 August 2026 · 250 MW · Australia

BW ESS has acquired the 250 MW / 1,000 MWh Yanco BESS project in Riverina, New South Wales from ACEnergy. The ready-to-build project connects to the Yanco 132 kV substation with CATL as System Integrator and ACLE Services as BoP contractor. Construction commences later in 2026, with commercial operation planned for 2028, underpinned by a long-term capacity swap.