ACEnergy appears in 1 renewable energy transaction tracked by Renewables.digital (1 as seller) in August 2026, with a combined capacity of 250 MW. Technologies: Battery Storage (BESS) (1). Countries: Australia (1). The most recent deal is “BW ESS Acquires 250 MW / 1,000 MWh Yanco BESS in Riverina, New South Wales from ACEnergy” (13 August 2026).
1Transactions
250 MWTotal capacity
1Countries
1With PPA
August 2026Period
Key facts
1 transaction in August 2026, 250 MW in total (average 250 MW per deal)
BW ESS has acquired the 250 MW / 1,000 MWh Yanco BESS project in Riverina, New South Wales from ACEnergy. The ready-to-build project connects to the Yanco 132 kV substation with CATL as System Integrator and ACLE Services as BoP contractor. Construction commences later in 2026, with commercial operation planned for 2028, underpinned by a long-term capacity swap.