Renewables.digital currently lists 4 renewable energy transactions in Japan between April 2026 and September 2026, with a combined capacity of 938 MW. By technology: Onshore Wind (3) and Battery Storage (BESS) (1). The most active companies are TerraWind Renewables Inc. (2), Achiha Co., Ltd. (1), BayWa r.e. (1) and Chugoku Electric Power Co Ltd (1). The most recent deal is “TerraWind Renewables Acquires Stake in 8.6 MW Kashimanomori Wind Project in Nanao, Ishikawa Prefecture, Japan” (29 September 2026).
4Transactions
938 MWTotal capacity
2Technologies
April 2026 – September 2026Period
Key facts
4 transactions between April 2026 and September 2026, 938 MW in total (average 234 MW per deal)
TerraWind Renewables Inc. has acquired a partial equity stake in the Kashimanomori Wind Power Project in Nanao City, Ishikawa Prefecture, Japan from Achiha Co., Ltd. The 8.6 MW project uses two Siemens Gamesa DD130 turbines and is currently under construction, with commercial operation planned for Q4 2027. TerraWind's Japan development portfolio now totals 391 MW.
TerraWind Renewables Inc. has completed the acquisition of a 100% interest in a 25 MW onshore wind project in Fukushima Prefecture, Japan. Construction is scheduled to begin in Q4 2026 with commercial operation targeted for Q1 2029. The acquisition expands TerraWind's Japanese onshore wind portfolio to 376 MW.
Energy Vault Holdings has closed the acquisition of an 850 MW battery energy storage development portfolio in Japan from BayWa r.e. AG, including an experienced local development team. The portfolio comprises 350 MW of advanced-stage projects (NTP expected H2 2027, COD from mid-2028) and 500 MW of early-stage projects. The deal brings Energy Vault's global owned asset base to over 1 GW.
Chugoku Electric Power Co Ltd and Toda Corp have acquired an undisclosed equity stake in the 54 MW Masuda-Hikimi Wind Power Project in Shimane Prefecture, Japan, from Mitsui OSK Lines and Hokutaku. The project features 13 wind turbines of 4.2 MW each and is developed through SPC Asia Wind Power. Construction is set to begin shortly, with operations scheduled for January 2030.
Data as of 12 November 2026. The overview covers the transactions currently listed in the Renewables.digital database; each deal links to its original public source.