Greenvolt Power and Bedrock Renewables Acquire 116 MW Operational Wind Portfolio Across Four Iowa Counties
Greenvolt Power and Bedrock Renewables have acquired three operational onshore wind projects in Iowa totalling 116 MW: Top of Iowa Wind (80 MW, Worth County), Crosswind (21 MW, Palo Alto/Clay Counties) and Hardin Hilltop Wind (15 MW, Greene County). All three projects are candidates for repowering as they approach the end of their initial operational life.
Transaction date: · Source: businesswire.com
Key facts
- Transaction date
- Technology
- Onshore Wind
- Capacity
- 116 MW
- Transaction price
- Not disclosed
- Country
- United States
- Region
- Iowa
- Location
- Worth County, Palo Alto County, Clay County and Greene County, Iowa, USA
- Continent
- North America
- Development status
- Operational
- PPA
- n.a.
Technology details
Three operational onshore wind projects: Top of Iowa Wind (80 MW, Worth County, operational since 2001), Crosswind (21 MW, Palo Alto and Clay Counties, operational since June 2007) and Hardin Hilltop Wind (15 MW, Greene County, operational since May 2007). All three projects are approaching the end of their initial operational life and are expected to be repowered in the next few years.
Additional information
Hardin Hilltop Wind was the first community-based wind project in Iowa. Top of Iowa Wind was the first wind farm developed in Worth County. Repowering will integrate new turbine technologies to increase efficiency, extend operational life and unlock additional value for host communities. Greenvolt Power's US pipeline has grown to approximately 2.4 GW across 8 states. Bedrock Renewables is based in Golden, CO.
Source
Original announcement: https://www.businesswire.com/news/home/20260518672764/en/Greenvolt-Power-and-Bedrock-Renewables-Acquire-116-MW-of-Operational-Wind-Projects-in-Iowa