Ray8 Energy Acquires Four Operating 8.0 MW / 23.4 MWh Battery Storage Plants in Japan from Second Foundation
Ray8 Energy, backed by ICG, has completed the acquisition of four operating high-voltage grid-connected battery storage plants in Japan totalling 8.0 MW / 23.4 MWh from the Second Foundation group. The plants are located in Shimane, Hyogo and Miyazaki prefectures across the Chugoku, Kansai and Kyushu grid areas, and are Ray8's first operating assets.
Transaction date: · Source: ray8.com
Key facts
- Transaction date
- Technology
- Battery Storage (BESS)
- Capacity
- 8 MW
- Transaction price
- Not disclosed
- Buyer
- Ray8 Energy Inc.
- Seller
- Second Foundation group
- Country
- Japan
- Region
- Shimane, Hyogo and Miyazaki Prefectures
- Location
- Goutsu City, Shimane (Chugoku grid); Miki City, Hyogo (Kansai grid); Tamba City, Hyogo (Kaibara, Kansai grid); Tsuno Town, Miyazaki (Kyushu grid)
- Continent
- Asia
- Development status
- Operational
- PPA
- n.a.
Technology details
Four high-voltage, grid-connected battery storage plants totalling 8.0 MW / 23.4 MWh. Commissioning dates: Goutsu (Shimane, Chugoku grid, March 2026), Miki (Hyogo, Kansai grid, October 2026), Kaibara (Tamba City, Hyogo, Kansai grid, October 2026) and Tsuno (Miyazaki, Kyushu grid, November 2026).
Additional information
Purchase price not disclosed. The acquisition adds Ray8's first operating assets to its nationwide Japanese development pipeline. Ray8 Energy is a Japan-based developer, long-term owner and operator of utility-scale BESS, backed by ICG, the London-listed global alternative asset manager.
Source
Original announcement: https://ray8.com/press-release/20261117.html