Jade Concept appears in 1 renewable energy transaction tracked by Renewables.digital (1 as seller) in April 2026, with a combined capacity of 21 MW. Technologies: Onshore Wind (1). Countries: Germany (1). The most recent deal is “ENOVA Acquires 21 MW Project Rights in Windpark Thüle, Lower Saxony from Jade Concept” (14 April 2026).
ENOVA has acquired the project rights for three Nordex N175 wind turbines (21 MW) in Windpark Thüle in Landkreis Cloppenburg, Lower Saxony, from developer Jade Concept and local landowners. Construction is underway and commissioning is planned for autumn 2027. The three ENOVA-owned turbines are expected to generate over 65,000 MWh annually. This is ENOVA's second acquisition from Jade Concept.
Data as of 30 September 2026. The overview covers the transactions currently listed in the Renewables.digital database; each deal links to its original public source.