OCI Energy appears in 1 renewable energy transaction tracked by Renewables.digital (1 as seller) in May 2026, with a combined capacity of 335 MW. Technologies: Solar PV (1). Countries: United States (1). The most recent deal is “Arava Power Acquires 50% Stake in 670 MWdc La Salle Solar Project in La Salle County, Texas” (13 May 2026).
OCI Energy and Arava Power have signed a Membership Interest Purchase Agreement (MIPA) for La Salle Solar, a 670 MWdc utility-scale solar project in La Salle County, Texas. Arava Power acquires a 50% stake, with both parties jointly financing, constructing and operating the project. Commercial operations are expected in 2028, with groundbreaking targeted before end of 2026.
Data as of 30 September 2026. The overview covers the transactions currently listed in the Renewables.digital database; each deal links to its original public source.